When the Army blew a bridge...

The Wilts and Berks Canal Amenity Group would have had one less bridge to build between Swindon and Wroughton, if it was not for the British Army in the Second World War.

Men from the Royal Engineers were ordered to parachute into Wroughton and blow up the stone bridge over the canal at Bushey Leaze Farm in Mill Lane. They then had to build a temporary one for jeeps.

Although there was no strategic purpose for the exercise, it helped the troops prepare for D-Day.

The bridge was supposed to have been replaced by the Army, but never was. However, there are plans by the canal amenity group to rebuild it in the coming few years, like the one next to it which was restored earlier this year south of Mill Lane.

David Phipps of Wroughton History Group researched the jump by the 591 (Antrim) Parachute Squadron Royal Engineers, which happened on Friday, November 19, 1943.

He is not exactly sure where the men landed, but managed to speak to their leader Lt Anthony Jackson, who is now living in Hampshire.

Lt Jackson told him: "My troops began the day with a parachute jump from an Albemarle aircraft, followed by a rapid approach march of a few miles to the site, carrying their weapons and engineer equipment.

"At that time there was an acute shortage of aircraft for parachute training, so the Albemarle, which was normally used as a glider tug, was given a trial.

"It was a small aircraft which could only take eight to 10 men, and was very cramped for heavily laden paratroops".

The tasks allotted to the men were to demolish the bridge at Bushey Leaze Farm House and to carry out repairs so the crossing was fit for the passage of jeeps.

Lt Jackson said: "On this occasion, as on many other exercises in the months before the D-Day landings, we received full co-operation from the civil population and the local authorities concerned.

"I think it was felt that we were all in it together, as indeed we were".

The landowner was Wiltshire County Council's smallholdings committee, which gave permission for the exercise. Mr Phipps, at the Records Office in Trowbridge, discovered a note dated November 10, 1943, which Lt Jackson gave to the farm tenant Mr Hart to specify the Army's intentions.

It read: "Time of jump – 1100 hours (approx). Time of demolition – 1600 hours (approx)".

The county council's land agent, Mr Watson, stipulated to Lt Jackson that "neither Mr Hart nor any of his animals were to be blown up." Luckily the troops did not break this rule.

In a letter from Mr Watson to Mr Hart, he wrote: "A captain of the Royal Engineers telephoned me today about the bridge, and I told him that the committee would have no objection to the bridge being blown up, provided they put another one there for you to use.

"What he said they would probably do was to drop the bridge into the canal, and put pipes into take the water."

A Major in the squadron said he undertook to replace the bridge at near ground level, with a causeway drained by concrete pipes. It appears this wasn't done".

Bushey Leaze Farm was next to Westleaze Farm, and the former tenant there, Will Messenger, remembers the problems he had collecting the stones, bricks and other debris that were hurled over the fields by the explosion.

The remains of the canal crossing still exist, but the public footpath that leads there is currently closed due to foot and mouth restrictions. It is south of the recently rebuilt Beavan's Bridge at Westleaze.

Mr Phipps, also a member of the canal amenity group, said: "The irony is that Bushey Leaze Farm's house and buildings were later destroyed when the M4 motorway was put through in 1971. The site is where the new rookery is in Mill Lane, just north of the bridge over the M4".

By Helen Moss
Swindon Advertiser, 2/6/2001

Letter from County Land Agent to Mr Hart of Bushey Leaze Farm

Dear Sir,

West Leaze.

In reply to your letter of the 12th inst., Capt. Davidson of the Royal Engineers telephoned me today about the bridge, and I told him that the Committee would have no objection to the bridge being blown up provided they put another one there for you to use.

What he said they would probably do was to drop the bridge into the canal, as I suggested should be done some time and put pipes in to take the water. He thought two 12" pipes side by side would be sufficient and I told him that Hills of [Swindon] could supply them.

They will probably not be doing the job for two or three weeks and I told them to be careful and see that they did not blow you up or any of your animals, etc!

Yours faithfully,
(Signed)
County Land Agent.

Mr. E. T. Hart, Bushey Leaze Farm, Wroughton, Swindon, Wilts.
14th October, 1943.