Dry Dock 26 - Dec 2021
Nearing completion of the Dock wall. Bottom lock is to the right.
Dry Dock 27 - 2018
Before restoration - 2018
Dry Dock 28 - Apr 2022
Completed Brickwork - April 2022
Dry Dock 30
The metal supports for the oak posts are fitted
Dry Dock 31
Putting the metalwork together which will fit over the metal supports
Dry Dock 32
The fitted metal work. This will provide greater strength to protect the integrity of the roof in very strong winds
Dry Dock 33 - First casting
Using wooden formers the first concrete coping is cast
Dry Dock 34 - First Coping after former removed
Coping after the removal of former
Dry Dock 35 - Grass cut in Dock
Coping on west wall of Dry Dock
Dry Dock 36 - East Wall looking North
The east wall looking north with Carpenters Workshop in distance
Dry Dock 37 - Pillar casting
Coping for the first of the external pillars is cast
Dry Dock 38 - Dry Dock looking South
Looking south. All coping complete except for curved wall at southern end.